Project: Geek   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Gary Phenning   -  
Project:   Kitfox - Series 7   -   VIEW REPORTS
Total Hours:1393.7
Total Flight Time:0.4
Start/Last Date:Mar 06, 2021 - Apr 06, 2024
Engine:Rotax 912is
Propeller:Whirlwind
Panel:Garmin G3x
 
Friendly URL: https://eaabuilderslog.org?s=Geek

Home or Last Project Picture

Sep 03, 2021     Electrical Cables - (12 hours)       Category: Wings
Have been building the electrical cables that go into the wings. Now have the magnetrometer, pitot heat and both port and stbd cables for lights (landing and nav lights) completed. The light cables are set up with connectors where the wing tips attach as well as at the wing root. I haven't attached those wing root connectors just to make routing them down the wing spars easier. The magnetrometer is also going to be routed down the rear spar while the OAT cable will route behind the fuel tank to keep the length of the cable in spec. The magnetrometer, lights and OAT will all be incorporated into the one wing root connector for the port wing. Stbd wing is easy with only the lights coming out to the root.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.